
The essentials
- Evidence that surfacing meets AS 4422, for the fall height on your site.
- A comprehensive post-installation inspection by a competent person, with a drop test of unitary surfacing.
- The manufacturer's maintenance schedule and warranty.
- An updated inventory and a date in the diary for the three-year retest.
Questions before you sign
- Which product, at what thickness or depth, for what fall height?
- Will you provide the AS 4422 test evidence with the quote?
- Who prepares the base, and where does water drain? See water play, taps and drainage.
- Where will joins fall? Kidsafe advises avoiding them in high-traffic areas.
- Is the post-installation inspection and drop test included in the price?
- What does the warranty require us to do?
The handover pack
Kidsafe's safety management guidance lists the documentation a playground owner should hold. For a new installation, ask for:
- certification records for equipment and surfacing;
- the comprehensive post-installation inspection report, including drop test results;
- the manufacturer's installation, inspection and maintenance instructions;
- warranty details and expected lifespan;
- for any plumbing, the compliance certificate.
Kidsafe notes that the manufacturer is required to provide a documented maintenance schedule with new equipment.
The first month
Add the new items to the inventory. Put the routine, operational and annual inspections into the calendar, and the drop test three years out. Brief staff on what changed: new fall zones, new edges, new shade posts.
Avoid modifying equipment yourselves. Kidsafe warns that modifications may void the manufacturer's warranty; go back to the manufacturer for parts and changes.
Budget for its whole life
The purchase price is the beginning. Kidsafe suggests a minimum of 10 per cent of the entire playground budget per year for maintenance. Write that into the service's budget in the year the playground is built, while everyone remembers what it cost.
Questions committees ask
The installer says a drop test is unnecessary. Is it?
Kidsafe's guide to the standard lists drop testing of unitary surfacing as part of the post-installation inspection, repeated every three years.
Who should do the post-installation inspection?
A competent person, ideally independent of the installer.
What if documents are missing for an older playground?
Commission a comprehensive inspection and build the inventory from it. Start the folder now.
Sources for this chapter
Tanbark is general information. Requirements change and every site is different: confirm with the regulator, your department or sector body, and a competent playground inspector.