Cover · Committee brief
Committee brief
Print this for the next meeting. Every line is explained in the chapter beside it.
| What we are responsible for | Equipment and surfacing that comply with AS 4685 and AS 4422, and an outdoor space that meets the regulations that apply to our service. | Ch. 1 |
|---|---|---|
| The space rules (early childhood) | Seven square metres of unencumbered outdoor space per child, a child-proof fence, adequate shade, access to the natural environment. | Ch. 2 |
| Where soft fall is required | Under equipment with a fall height of 600 mm or more, and under swings, slides and spinning items. | Ch. 3 |
| Loose-fill depth | Installed at 300 mm or more; never allowed below 200 mm. | Ch. 3 |
| What to schedule | Routine checks daily or weekly; operational inspections every one to three months; a comprehensive inspection annually by a competent person; a drop test of rubber surfaces every three years. | Ch. 4 |
| Summer | Check surface temperature before play; 50 °C or more is too hot. Shade over equipment and sandpits; no shade posts in impact zones. | Ch. 5 |
| Water | Surfaces must drain. Plumbing and drainage by a licensed plumber, with a compliance certificate over $750. Staff know where the main is. | Ch. 6 |
| What to keep | Inventory, certificates, inspection reports, drop test results, maintenance schedules, warranties, repair and incident records. | Ch. 7 |
| What to budget | Kidsafe suggests at least 10 per cent of the playground budget each year for maintenance. | Ch. 7 |
A summary of guidance published by ACECQA, the Victorian School Building Authority, Kidsafe and the Building and Plumbing Commission, as read on 24 November 2026. Confirm what applies to your service.